         MRM Engineering completed the electrical deisgn of the earthing grid three new
         field substations for mine. The design included modelling of the earth grid using
         SafeGrid© design software, analysis of the earth fault levels, and step and touch
         potentials to ensure that the earth systems were compliant with Australian
         Standards. Detailed design drawings were provided for the earth grid and
         substation area fencing, signage and installation requirements.